The buildings of this school are about a hundred years old .. After inspecting the buildings by the Engineering Office of the organization, a decision was made to remove the old buildings because of their disrepair and the severe decrease in the ground level and reconstruct them
The project includes (construction of 9 classrooms, a teacher’s office, a male teacher’s office, a female teachers office and an office for the principal, backfill work to raise the ground level by one and a half meters, construction of bollards along the buildings, tiling and planting a garden, construction of a school theater, a sports stadium, a prayer room, construction of umbrellas(shades) in the squares, construction of a full fence, provision of water coolers and the removal of the old buildings, and fixing the lighting and water system)
This project is considered to be the largest in the history of the organization, where a complete school was built by the community. It is considered the first school in Sudan to be built on the proposed new educational ladder system, which includes the basic and intermediate stages. the building was designed by the organization’s engineering department to ensure its separation into two schools after the approval of the new educational ladder.